- Description: The new distribution center for the worldwide corporation Colgate-Palmolive in South America. This modern distribution center is equipped with 32 loading docks. It was designed in an expedited process of just 3 months using prefabricated systems to complete total construction in only 13 months. In this project, our 3D-Model Designs were developed considering the manufacturing process. Working together with the Manufacturing Steel Company, and the PreCast Concrete Company, our design went from the 3D Model designed by I.D.D. to the Numeric Control Machines of the manufacturing companies. This process, not only reduces time in the construction process, but also minimizes human error during the manufacturing process.
- Category: Industrial
- Scope: Architectural, Structural, and MEP Designs
- Client:Colgate-Palmolive
- Location: Palmira
- Size: 280,000 sf